KIT 03

Adjustable pressure switch. Body, upper part and grommets made of polypropylene, internal diaphragm made of natural rubber, stainless steel screws (stainless steel AISI 304). 90° male threaded 1" suction and delivery connections. Equipped with electronic automatic start and stop device to prevent the pump from running dry, built-in non-return valve, pressure gauge, manual reset button and adjustment screw to vary the starting pressure from 1.5 to 3 Bar. Generally, the KIT 03 pressure switch is used to control the operation of a pump by ensuring a constant pressure in the system. Ideal for pressurisation of small buildings. 10 A electronic card for electric pumps up to 1.5 HP.

Key Features

Brand ESPA
Restart pressure 1,5 - 3,0 bar
Voltage 1 x 230 V
Max. pump power 1,1 kW
 

BUY MODEL VARIANTS

In this section you will find all the variants of this model in the catalog: you can use the filters below to make your search more specific. When you have identified the variant you need, specify the quantity and use the button to add it to your Shopping List.
Loading...

Related products

Blog Waterfitters

a pool robot for cleaning | Water Fitters
A pool robot: top-notch cleaning! Features, functionalities, and tips.

Cleaning the pool has never been this easy! The pool cleaning robot we've always dreamed of is finally available.

Read more
pool water recirculation products and pumps | Water Fitters
Pool water recirculation: what it is used for, which scheme to adopt and which pump to choose.

The pump for pool water recirculation ensures filtration quality, optimal comfort, and energy savings.

Read more
Industrial Refrigeration Valves | Water Fitters
Check and Shut-off Valves for industrial refrigeration systems.

Check or non return valves and Shut-off Valves in Hydraulic Refrigeration Systems: facts and main applications.

Read more
Tecnoplastic hydraulic level switches | Water Fitters
What can we do when your level switch does not work really properly?

When a float level switch stops working, it is essential to carry out some preliminary checks. What actions should be taken?

Read more